March2014

The floor has been levelled and insulation laid for the ground floor apartment.  The builders have made sure this is well insulated from the soil below.  The orange pipe is for ventilation to stop moisture accumulating.

Read More »

Work is progressing on the bedrooms.  The first photo is the view from the master bedroom through the door towards the top of the stairs.  This room will be magnificent, stretching across the whole of the front of the house.  The second photo shows the now-removed mezzanine floor – it[…]

Read More »

The first floor bathroom has gone!  This will be the second suite on the top floor, the bathroom will be moved next to the staircase so that it can be used as an en-suite or accessed from the landing.

Read More »