June2014

Now the stud wall has gone into the master bedroom you can really see the scale of both rooms.  Even the toilet cubicle goes the full height, with those wonderful exposed beams on show.  

Read More »

Things are moving along nicely now with plasterboard starting to go in, in places.  The Italian system of electrical wiring is quite different to the UK – they put in plastic conduit and the actual cables are poked through the conduit later.  It actually makes a lot of sense –[…]

Read More »

Now it’s the turn of the ground floor to be full of poles as the upper floors get screed laid down.  The second photo shows the lovely ceiling beams again. The weather is now getting seriously hot and there’s lots of work to do on the grounds… do you think[…]

Read More »