Most of the downstairs apartment and the ground floor are now plastered. The fourth photo gives a really good view from what will be the kitchen, looking back towards the living room.
The ground floor apartment is really starting to take shape. The plasterwork over the walls and ceilings has been done, and the stud work is nearly there too. We’re leaving some of the stone walls and brick tile ceilings exposed. It’s amazing to think this was animal housing five months[…]
The new window sills are being fitted, the local stone is lovely and really compliments the older stonework that it’s sitting against. Plumbing work has started, with fittings in place ready for the air conditioning, and hot and cold water supplies and under-floor heating and cooling pipes are being laid[…]
The upstairs rooms are really beginning to take shape. The first photo is a view through from the master bedroom through to the en-suite, with the newly created doorway on the left. The second photo is the view down the staircase with the new stud walls to create the second[…]