Work is progressing on the bedrooms. The first photo is the view from the master bedroom through the door towards the top of the stairs. This room will be magnificent, stretching across the whole of the front of the house. The second photo shows the now-removed mezzanine floor – it used to house a teenage boy who was rather keen with a marker pen. Taking out the mezzanine gives a 4 metre height to the upstairs rooms with exposed beams… and we’ll have to paint over the graffiti a few times.
The final photo is the lower ground floor – the boiler will be taken out and this will become the double bedroom for the private apartment.
Things are really starting to take shape and I’m beginning to picture how the final house will look. Lots of time needed to choose fixtures and fittings.